BSL Township is witnessing temporary phases of load shedding today after a restriction on power import by DVC reduced the available electricity supply. As a result, different sectors of the township are receiving power on a rotational basis to manage the shortfall.
The arrangement has been put in place to ensure that all residential areas continue to get intermittent supply while the situation stabilises. Technical teams are keeping a close watch to maintain continuity and minimise inconvenience.
Power supply is expected to return to normal by 10 pm, and residents are requested to bear with the temporary disruptions.

Post a Comment